Constructing of Slavyanskaya CS
The project "Development of gas transportation capacities of the North-West Region UGSS, Gryazovets - Slavyanskaya CS section" was implemented to ensure gas supply to the Nord Stream-2 gas pipeline starting point.
The Slavyanskaya CS is designed to supply gas to the Nord Stream 2 gas pipeline offshore section, which will deliver gas to Greifswald (Germany) via two 1,200 km long pipes laid along the Baltic Sea bed.
For that project, PTPA manufactured and and delivered Ball Valves DN 800 and 1200 controlled by pneumohydraulic actuator and electrohydraulic actuator.