Construction of Belarusian NPP
Construction of Belarusian NPP is one of the major projects of the Rosatomcorporation, which is currently under implementation.
Location: Ostrovets (Grodno region), type of reactor: WWER-1200, number of power units: 2.
In 2018, PTPA manufactured and delivered Wedge Gate Valves, Non-Return Valves, Pulse Safety Devices, Bellows Control Valves for NPP construction.
These valves are designed for installation on production lines both under the shell and outside the shell of reactor compartment.
Location: Ostrovets (Grodno region), type of reactor: WWER-1200, number of power units: 2.
In 2018, PTPA manufactured and delivered Wedge Gate Valves, Non-Return Valves, Pulse Safety Devices, Bellows Control Valves for NPP construction.
These valves are designed for installation on production lines both under the shell and outside the shell of reactor compartment.